Scoping Report

Ends on 14th October 2026 (34 days remaining)

2. How we will prepare the new Local Plan

2.1 This new local plan will be prepared in accordance with the new plan making regulations. Figure 2.1 sets out the main stages of local plan preparation under the new system - including this Scoping Consultation stage. It also indicates when we think each stage will happen. The stages of plan preparation will be different to what you might be used to; a useful graphical summary of the new plan making system has also been prepared by consultants ARUP.

Flowchart outlining Rutland Local Plan 2026 to 2046 consultation process, detailing consultation phases, gateways, examination, and adoption stages. Colour-coded boxes with dates and descriptions highlight key milestones, including public consultations, evidence gathering, and final adoption by 30th April 2029.
Figure 2.1: Main stages and timetable for preparing our new local plan

2.2 Our timetable may change as we progress through the process. You can keep up to date by checking this webpage; the timetable will be reviewed every month and the website updated if necessary.

For instructions on how to use the system and make comments, please see our help guide.