Showing comments and forms 1 to 2 of 2
Support
Regulation 19 Rutland Local Plan
Representation ID: 8460
Received: 02/12/2024
Respondent: RWE Renewables UK
Agent: Stantec
Representation Summary:
RWE is pleased to see the use of a policy to ensure that the continued operation of existing or approved renewable energy infrastructure is unaffected by future development schemes.
Support
Regulation 19 Rutland Local Plan
Representation ID: 8610
Received: 02/12/2024
Respondent: Anglian Water
Representation Summary:
Support Policy CC9 and the need to protect renewable energy infrastructure and specifically the opportunity to generate and optimise renewable energy production at AWS sites and consequently the need to prevent other development reducing or removing that generation
opportunity.